Runway 18L/36R Closed Nightly for Rehab Work
Charlotte Douglas International Airport is conducting scheduled rehabilitation work to Runway 18L/36R nightly from 11 p.m. to 7 a.m. The work on this runway, which runs parallel to the terminal on its east side, includes removing Taxiway C7 and rehabbing asphalt taxiways.
During the closure hours, the FAA will reroute air traffic to the Airport’s other runways. Those neighbors may experience additional overhead flights between the hours of 11 p.m. and 7 a.m.
The work will halt during the busy Thanksgiving and Christmas travel season and then resume in March for runway repaving.